Drilling works
- Drilling and drilling repairs
- Shallow drilling
- Deep drilling
- Spike drilling
Water supply
- Water supply system designing
- Water supply system mounting
- Water supply system service maintenance
Geology
- Sounding
- Laboratorial research
- Drilling and sample taking
- Methods, standards, reports
Construction works – Ground water lowering
Water lowering. Practically during the construction of any building, construction companies have faced the high level of ground water. For execution of qualitative „0” cycle works
- Water lowering in complex geologic conditions
- Dehydration of large area
- Water lowering amiable to surrounding buildings
- Recovery of ground water level below the existing buildings
- Laying of drainage system for water diversion from the place of construction
- Arrangement of drilled pales up to d. 400
- ODEX pale arrangement
- Injection pale arrangement in limited conditions
- Anchor pale arrangement Ishebeck, MAI
- Arrangement of limiting walls of drilled pales
- Pressed in pales